2026-10-13 06:06 UTC15 min
17.4 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-10-10 10:45 UTC5.8 h
11.8 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-10-09 02:13 UTC12.3 h
18.6 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-10-09 00:40 UTCend time not published
15.8 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-10-09 00:04 UTC20 min
15.8 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-10-08 23:37 UTCend time not published
15.2 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-10-08 23:13 UTCend time not published
15.2 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-10-02 23:12 UTC1.7 h
10.6 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-10-02 22:47 UTCend time not published
10.8 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-10-01 06:01 UTC1.7 h
5.2 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-09-18 17:41 UTC48 min
16.4 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-09-18 15:54 UTC6 min
15.6 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
2026-09-18 15:36 UTCend time not published
15.6 mm rain in the 24 h before, gauge Levens Bridge End, 6.8 km
Rainfall comes from the nearest Environment Agency rain gauge within 10 km, using 15-minute readings rolled into hourly totals. Where a gauge is further away, or too many readings are missing, we say so rather than guess. Rain figures do not show whether a discharge was permitted; that is a matter for the regulator. How we keep the record.